Participation
Participation
Space Application
- Applications will be accepted by April 30th, 2026 in order of receipt.
However applications may be rejected if space is fully booked before the above deadline. - Minimum space application is at least 18㎡(2 booths). One booth is 9㎡(W3m×L3m).
- Send application form duly filled out and signed by the exhibitor to the Secretariat office.
- TOOL TECH + SMART WELDING AUTOMATION FAIR 2026 Secretariat
Korea Tools Industry Cooperative(KOTIC)
Tool bldg., 46, Sinsu-ro, Mapo-gu, Seoul, 04088, Korea
Tel : +82-2-711-0989 Fax : +82-2-3272-5059 E-mail : 7110989@naver.com - Space Rental Cost
| OPTION |
Space Only |
Shell Scheme |
| Cost | US$ 3,000 | US$3,500 |
- Payment
After the submission of an application form, 50% of total participation fee should be paid by participants, and the balance should be paid by August 14th, 2026 separately. - Remittance Bank
Bank Name : Kookmin Bank
Branch : Sogang Branch
Account Number : 054968-09-100014
SWIFT No. : CZNBKRSEXXXAddress :221, Tojeong-ro, Mapo-gu, Seoul, Korea
(Tel : +82-2-717-4791)Account Name : Korea Tools Industry Cooperative
- Space allocation
Space allocation will be exclusively decided by the organizer in order ti receipt of 50% of space rental cost, taking into account booth size and type of exhhibit.
Booth Decoration
- Raw Space(Space only) : US$ 3,000

- Shell Scheme : US$ 3,500
The organizer will provides generic construction for only those companies which choose shell scheme.

- Booth specifications
– Side and rearward walls
– Carpeting of floor
– A facia board inscribed with the exhibitor’s name(Include a booth number tag)
– An information desk
– A folding chair
– Basic electric light fittings(3 spotlights per 9㎡)
- Electricity will be supplied only basic electric light fittings. For use of additional electric lights and electric appliances and equipments, the exhibitor must submit an utility application form to the organizer.
Technical Utility Services
| CLASSIFICATION | UNIT | COST(US$) | FACILITY DETAILS |
| Electricity | 1 kw | US$ 90 | For lighting: single phase 220V, For power: single phase 220V, 3 phase 220V, 3 phase 380V |
| Telephone | Domestic call only | US$ 100 | downtown, out-of-town, cell phone use |
| Int’l call | US$ 200 | International phone use included | |
| LAN for Internet | 1 port | US$ 230 | T1 Line |
| Water supply/drainage | 1 line | US$ 230 | ø15mm, ø25mm, 4kg/cm² |
| Compressed Air | 1 line | US$ 230 | ø9mm, 8kg/cm² |
| US$ 320 | ø15mm, ø20mm, 8kg/cm² | ||
| Bar-Code System | 1 set | US$ 250 | Barcode equipment rental, visitor data provided |